Power Outages and Infrastructure Reliability in Cambodia

Power Outages and Infrastructure Reliability in Cambodia – Challenges, Causes, and Solutions

As Cambodia continues to grow economically and urbanize rapidly, its infrastructure particularly in the energy sector faces mounting pressure. Power outages remain a common disruption, affecting both daily life and long-term development.

In this article, we explore the core causes of these blackouts, their impact on society and business, and what’s being done to create a more resilient and reliable system.

sunset, countryside, power lines, power poles, nature, high-voltage pylons, electricity pylons

Current State of Power Supply in Cambodia

Cambodia’s energy sector has made significant strides over the past decade, yet challenges persist.

The country’s electricity is primarily sourced from:

  • Hydroelectric power (largest share)
  • Coal-fired power plants
  • Imports from Thailand, Vietnam, and Laos

According to the ASEAN Centre for Energy, despite rising generation capacity, electricity shortages remain prevalent, particularly in the dry season when hydroelectric output drops.

Key Trends:

  • Phnom Penh and surrounding areas experience frequent rolling blackouts, especially during periods of high demand.
  • In Kandal Province, Electricite du Cambodge (EDC) has issued multiple public announcements detailing four-day scheduled outages to cope with technical limitations and planned upgrades.

These blackouts aren’t just minor inconveniences—

they disrupt everything from household routines to business operations and digital services.


Main Causes of Power Outages

1. Climate Change and Hydroelectric Dependency

Cambodia’s reliance on hydroelectric dams makes it vulnerable to climate variability. Drought conditions, often intensified by El Niño, significantly reduce water levels in reservoirs, leading to widespread energy shortfalls. According to ASEAN Energy News, this was a key factor in the 2023-2024 blackouts.

2. Aging Infrastructure

The national grid, though expanding, is aging and often lacks the capacity to handle peak loads. Transformer failures and substation faults frequently lead to unscheduled outages, especially in urban districts where demand is highest.

3. Urban Growth and Industrial Expansion

Phnom Penh has experienced an explosion of urban development. Industrial zones and high-rise buildings require more electricity than the grid was initially designed to handle. This growth continues to outpace infrastructure upgrades.

4. Scheduled and Unplanned Maintenance

Regular maintenance is necessary but often leads to multi-day outages, particularly in under-resourced districts. EDC often issues notices, such as this four-day outage warning, as a preventive measure, though not all outages are pre-announced.


Effects of Power Outages on Cambodia’s Economy and Residents

Power outages in Cambodia have ripple effects that touch all sectors of life.

Economic Impact

  • Small businesses are hit hardest, especially those without backup power. Khmer Times reports many SMEs struggle to stay open during outages.
  • Industrial zones face reduced productivity and increased costs due to halted operations.

Societal Impact

  • Disruptions in telecommunication systems affect banking, internet access, and mobile connectivity.
  • Traffic signals and public lighting failures raise road safety concerns, particularly in urban areas.
  • Households rely on diesel generators, which are costly and contribute to pollution.
  • Reddit discussions highlight increased concerns over security during power cuts, with reports of alarm failures and increased vulnerability to theft.

Government and Utility Provider Responses

Electricite du Cambodge (EDC)

EDC is the country’s main utility provider, managing both electricity generation and distribution. In response to ongoing outages, EDC and the Ministry of Mines and Energy have launched several initiatives:

  • Grid expansion and substation upgrades in high-growth zones like Phnom Penh and Sihanoukville.
  • Import agreements with neighboring countries to supplement domestic supply during dry months.
  • Public outreach with detailed announcements regarding scheduled blackouts to reduce uncertainty.

For example, EDC recently launched a campaign encouraging households and businesses to reduce non-essential electricity usage during peak hours.

Power Outages and Infrastructure Reliability in Cambodia

Infrastructure Reliability Beyond Power: Transportation and Telecommunications

Power instability doesn’t stop at home or work it ripples into other key infrastructure:

Transportation Systems

  • Traffic light failures are a common hazard during outages, leading to congestion and accidents in Phnom Penh.
  • Electric-powered public transport initiatives, still in early stages, face delays due to unreliable electricity.

Telecommunications

  • Blackouts impact mobile tower operations, reducing service range and causing signal dropouts.
  • ISPs rely on backup systems, but smaller providers often experience downtime during long outages.

In response, the government is working toward digital infrastructure modernization and encouraging telcos to invest in off-grid backup systems to keep networks operational.


Future Outlook: Improving Stability and Sustainability

Renewable Energy Development

Cambodia is turning to solar and wind energy to diversify supply and reduce dependence on hydropower. Solar farms have been launched in Svay Rieng and Kampong Speu, with support from international partners like ADB and USAID.

Smart Grid Investments

Pilot projects in Phnom Penh are testing smart meters and automated switching systems that could drastically reduce outage duration and help manage load fluctuations more efficiently.

Regional Energy Cooperation

Cambodia is part of ASEAN Power Grid discussions, exploring expanded regional connectivity and shared energy reserves, offering a more resilient response to seasonal shortages.


Conclusion

Power outages in Cambodia are symptomatic of broader infrastructural and environmental challenges. While the government and EDC are actively addressing these issues through modernization, diversification, and regional cooperation, short-term impacts remain real for businesses and residents alike.

As Cambodia pushes forward into the next phase of economic growth, balancing sustainability with development will be crucial. Addressing climate risks, modernizing aging grids, and embracing renewable energy sources are not just optional they are essential for ensuring infrastructure reliability in the years ahead.